Home » 20 Days Wrenching With My Australian Friend Convinced Me Not To Give Up On My Impossible eBay Jeep Project

20 Days Wrenching With My Australian Friend Convinced Me Not To Give Up On My Impossible eBay Jeep Project

Ebay Jeep 519 Pp Ts

Back when The Autopian started, a reader named Laurence bought a Chrysler Valiant Ute on my behalf. I then flew all the way to Dubbo, New South Wales, and he and his girlfriend kindly put me up in his home for a month while we tried turning a complete basket-case into something that could get through inspection and tackle an epic road trip. Against all odds, we pulled it off, which is why, when crunch time for my eBay WWII project came, I was glad I had a secret weapon.

Whereas Laurence was the leader of that Chrysler Valiant project — since he has an unbelievable amount of knowledge when it comes to that platform — on this project (which involved trying to assemble an entire brand new World War II Jeep from scratch using primarily parts from eBay), I ran the show. Laurence doesn’t have experience working on Jeeps, but he’s a mechanical wizard, and if there’s anything I’ve learned working on cars over the years, it’s that having a competent friend help you with a project doesn’t make you twice as efficient: It makes you probably 4-5 times as efficient. It’s truly remarkable how much having another set of hands can accelerate a car project.

Vidframe Min Top
Vidframe Min Bottom

Our talented Video Manger, Griffin, just finished a video of Laurence’s final days in California as we tried to get as much done as possible while The Australian-Wrench was in town.

[Note: You’ll have to forgive the three-week gap in content, as the project’s crunch-time and a mountain of other obligations, plus some illness, has set me back. But I’m feeling better, and things have calmed down, so consider this blog the beginning of a wave of WWII Jeep content. I can’t wait to show you what happened/is still happening! -DT]

In the last update, I wrote about how we built an entire WWII Jeep steering system using entirely parts I bought from eBay. Before that update, I wrote about what happened when Laurence and I tried starting the brand new, France-built Willys Go-Devil engine for the first time.

In the video above, you get a good idea of just how much work got done in those 20 days that Laurence was in town. Seriously, this is what things looked like when he showed up:

Img 4489

There was just a frame with a suspension hooked up. Plus, in just a weekend, my friend Brandon (shown below) and I had rebuilt the Jeep’s T-84 manual transmission, installed the leaf springs on the axles, gotten started on the engine (we finished the bottom end) using an old Jeep engine as reference, and lapped the valves:

Img 3082Screenshot 2026 05 14 At 10.05.49 amImg 3011Img 3069Img 3074Img 3050Img 3129 2

Laurence was here in February, and I was set to start a 900 mile road trip to the Easter Jeep Safari in late March. I had to build basically a whole car from scratch in a suburban LA backyard in less than two months, and I had Laurence for only 20 days. So I knew we had to maximize that time. And boy did we.

Img 4458 3

Here’s a little photo gallery of some of the Wrenching Laurence and I did in those 20 days. This article, the final “Laurence chapter,” of this build series, is meant to not only show how helpful he was, but to thank him for being an incredible wrenching partner.

Here we are at the Petersen Automotive Museum, where we took a bunch of photos of this restored WWII Jeep. These photos were very useful reference points:

Img 4852 2

Here he is cooking some “snags” after we’d successfully rebuilt the transfer case:

Img 4498

Here are some photos of a swap meet we attended in Long Beach:

Img 4606Img 4604Img 4602Img 4599Img 4594

Here he is trying to loosen some tie rod ends, only to realize they were stuck and we had bigger fish to fry.

Img 4714

I later took those tie rod ends and a bent driveshaft to an amazing driveshaft shop (which took payment in beer) in Monrovia, CA:

Img 5102Img 5105Img 5104

Here’s poor Laurence after having to clean up my mess. I had accidentally purchased and installed (with a lot of RTV) the wrong timing chain cover onto the new engine. When I realized the cover was wrong, it was Laurence who had to take it off, scrape off the RTV, find the right timing cover on my parts engine, and install that:

Screenshot

Here he is buttoning up the new engine, installing a thermostat on that gorgeous new cylinder head:

Img 4686

Here’s Laurence fastening the brand new eBay-sourced carburetor to the intake manifold:

Img 4717 2

Here’s the Australian wrenching legend loosely bolting the brand new, entirely eBay-sourced steering column to the brand new frame; as you can see, he and I had spent a few hours erecting the humongous tent we had to buy since we couldn’t allow a rainstorm to cost us a week of his time:

Img 4871

Laurence is off to the right in this image helping me crane the fresh engine onto the engine mounts on the frame.

Img 4880

Behold Laurence hooking up the exhaust after he and I lifted the transmission/transfer case up onto the frame crossmember and bolted the bell housing onto the back of the engine:

Img 4893 3

Laurence is shown here filling up the radiator prior to our first-start attempt:

Img 4906 2

I have no clue what Laurence is doing here, but it appears he’s doing the “safety squints” trying to shorten a bolt with an angle grinder:

Img 4914

Here’s some more grinding, this time it appears a nut is being rounded:

Img 4649

We visited Roscoe’s Chicken and Waffles, and it was actually worth the hype:

Img 4763Img 4764

Anyway, you’ve already seen the engine build content, and you’ve already heard the motor run:

 

View this post on Instagram

 

A post shared by The Autopian (@theautopian)

But I wanted to finish up this “Laurence Chapter” of the build by showing what things looked like by the time he left back for Australia, because the next chapter in which I am all by myself facing an unbelievably daunting deadline is without a doubt the most intense wrenching I’ve ever done.

Laurence and I — having bolted up the rebuilt transmission/transfer case to the engine, having hooked up a cooling system, and having fired up the motor — figured we’d give the Philippines-sourced body-tub a test-fit before Laurence left. This moment was an important one because one of my biggest fears was whether or not I would have to make major modifications to the body or frame to get it all to fit. And if I did have to make these modifications, I’d at least like Laurence there to brainstorm with so I could have a gameplan as I stared down the final 40 days of solitary wrenching against a crazy deadline.

Screenshot 2026 05 18 At 1.46.44 pm

Griffin (our ridiculously strong Video Manager), Laurence (a ridiculously strong Australian) and I (a blogger) took hold of the tub, with Griffin lifting the back and Laurence and I up front near the cowl:

Screenshot 2026 05 18 At 5.12.06 pm

The whole tub probably weighs about 400 pounds, so each of us could carry the Jeep fairly easily, though maneuvering the front over the steering column wasn’t easy on my shoulders, and when Griffin had to shoulder-shrug the back end to get it at the right angle, he was definitely straining a bit.

Screenshot 2026 05 18 At 5.15.08 pm

But we got the tub on there. And, at least from a distance, things looked…close.

Screenshot 2026 05 18 At 5.15.30 pm

I grabbed a fender and loosely bolted it into place on the frame and then against the body tub. Laurence and I then installed the bottom of the grille to the frame the sides of the grille to the fenders: Screenshot 2026 05 18 At 5.16.17 pm

The hood we loosely placed atop the grille and fenders.

Screenshot 2026 05 18 At 5.16.33 pm

And voila!

Img 4919 2

It looked pretty decent! As I would later find, getting all the body mounts to line up with the frame mounts would end up being a nightmare. Also surprisingly hard would be talking the brakes and steering, dealing with the driveshafts and differentials, rigging up an electrical system, installing seats and windshield glass, trying to getting the engine to run properly, and on and on.

But at least at the moment above, I was feeling more optimistic than I thought I would be 37 days out from The Big Day. The purpose of bringing my friend Laurence out to LA had been to get a ridiculous amount of wrenching done in a short amount of time, and to ultimately decide whether to pull the cord and let everyone involved know that this project wouldn’t be done in time for Moab or to trudge on.

With an engine that at least ran (but didn’t idle) and a body that seemed to fit reasonably OK, there weren’t any major red flags yet that were telling me not to keep going for it. And so, with less than a Lenten season to go, I felt motivated to give this project everything I had in the tank. Every tiny bit of talent and skill and Jeep knowledge and hope.

I was going for it, and it was thanks in large part to Laurence.

[Ed note: David mentioned the idea of building a brand new WWII Jeep to the team at eBay, and they loved the idea so much they said, “How can we help?” Their financial support and David’s Jeep-obsession are the fuel behind this crazy build. – MH]

 

Share on facebook
Facebook
Share on whatsapp
WhatsApp
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on reddit
Reddit
Subscribe
Notify of
8 Comments
Inline Feedbacks
View all comments
Andy Individual
Andy Individual
4 minutes ago

Imaginary wife: “When are you going to get all that crap out of our yard?”
David: Ducks question…

Dodsworth
Member
Dodsworth
18 minutes ago

When Laurence pinched his hand I levitated a bit and my eyes watered. My reaction would have been a bit more vocal.

Angry Bob
Member
Angry Bob
43 minutes ago

I miss working on cars with friends. We’ve all settled down and had kids, and I see them at birthday parties and such, and I do all my wrenching at night, alone.

Spikedlemon
Spikedlemon
49 minutes ago

I’ve often looked at things like this and wondered, who are these people with all this available time & money to fly around the world and spend weeks on projects like this (or, ever more-so, those people who fly others around the world).

Drive By Commenter
Member
Drive By Commenter
41 minutes ago
Reply to  Spikedlemon

Keep in mind Australia has actual labor laws with things like mandatory paid vacation for full time employees. 20 paid days annually.

Laurence used all his paid vacation time to help David wrench. What a friend!

Tim Connors
Member
Tim Connors
30 minutes ago

Also depends what his job is. I’m a teacher, so if it weren’t for kids and a dog, I could go on some adventures like this.

Tim Connors
Member
Tim Connors
31 minutes ago
Reply to  Spikedlemon

I’m assuming DT put him up in his place too, so plane ticket is mostly all that was needed.

Andy Individual
Andy Individual
3 minutes ago
Reply to  Spikedlemon

Credit.

8
0
Would love your thoughts, please comment.x
()
x